In 2022, BVSD assembled a comprehensive set of facilities critical needs totaling $350M. It was funded through a taxpayer-approved bond. The work identified for Crest View Elementary will be done in the summer of 2026.
As a part of the community engagement process, the district has involved two PTO members, Millie Marshall and Dan Retzlaff, in a Design Advisory Team. This webpage will highlight elements of the work that we think the community may be interested in. If you have any feedback or questions, please reach out to us at bond@rocv.org or catch us in person. You can also contact the BVSD Project Manager, Gene Temanson.
Quick Links
The DAT Guidelines linked above contains a template for the project timeline and milestones. Here is a summary. We are currently in the programming phase, clarifying work items and needs. Next is the schematic design phase, where the architect will prepare preliminary schematic design drawings. Then the project proceeds to the more detailed design development phase. After this, the DAT’s involvement is essentially over. The project team develops construction documents, solicits bids, selects subcontractors, and begins construction.
The following table expands on the scope of work described in the project page, and includes the 2022 cost estimates. The project has a responsibility to deliver on these specific promises to voters. However, within the scope of these items, there is some flexibility on design details. That’s where community input through the DAT process comes in.
The “playground surface” item has the most applicability to the community interests we’ve heard. We’ll try to get a basic understanding of the kitchen, plumbing, and roofing items, but we don’t expect they’re areas for significant DAT input.
Requirement | Cost |
---|---|
Access Fixed Ladders – Exterior (Missing) GYM | $4,256 |
Backboards – Basketball Renewal | $7,243 |
Dishwasher – Commercial Renewal | $26,000 |
Equipment – Missing Wall-Mounted Ladders ALL ROOF | $10,203 |
Exterior Closure – CMU Block Walls – Graffiti Coating | $63,000 |
Exterior Sealants – Roof – Older Renewal | $97,241 |
Flagpoles – Steel – Up to 35′ High Renewal | $7,765 |
Food Service – (2) WARMER Renewal | $15,600 |
Gas Piping – Corrosion Control – Roof | $5,045 |
Gutters Metal SOUTH SIDES OF CLASSROOMS Renewal | $90,740 |
Mow Curbs and Edges – Concrete – Back Fence Renewal | $20,000 |
Oven – Blodgetts Renewal | $33,800 |
Pedestrian Pavement Commons Area Asphalt Renewal | $28,001 |
Replace fire alarm control panel | $20,000 |
Relocate domestic water from trenches | $130,000 |
Playground Surface – Asphalt Renewal | $167,934 |
Grand Total | $726,828 |